Kafue Power Operations
Notifications7 new
Victoria Falls Unit 2 — Bearing Failure Imminent
TTF: 12 days · Vibration 7.8mm/s · Emergency overhaul required
Predictive Maintenance
5m ago
View
Kitwe 330kV Transformer — Emergency Replacement Required
TTF: 22 days · USD 4.2M CAPEX pending approval · 81,000 customers at risk
Grid Health Monitor
12m ago
View
Ndola Equipment Supply — Expiring in 45 Days
No auto-renewal clause · 3 non-compliant clauses identified
Contract Analyser
30m ago
View
Chipata Feeder 2 — NTL at 28.5%
Revenue loss: ZMW 3.2M/month · Field investigation required immediately
Billing & NTL
45m ago
View
2 Critical Tasks Assigned to You
Victoria Falls overhaul + Kitwe CAPEX approval — both due within 7 days
Task Manager
1h ago
View
5 Items Pending Your Approval
Kitwe CAPEX · VF Overhaul · Bangweulu Phase 2 · Ndola Contract · Q2 Plan
Review & Sign-off
1h ago
View
Q2 Drought Scenario — 380MW Shortfall Projected
Rainfall Index: 75% · Revenue impact: −ZMW 688M · Action recommended
Scenario Planner
2h ago
View
Mopani Copper Mines — ZMW 4.2M Overdue (45 days)
Largest outstanding account · Formal demand notice required
Billing & NTL
3h ago
View
Live telemetry · polling every 4s
Transmission Director · Grid Sandbox

Grid Simulation Sandbox

Toggle what-if scenarios — substation failures, drought generation cuts, demand spikes — to see real-time impact on system stability, frequency, reserve margin and load-shedding requirements.

Scenario Toggles
⚡
Kitwe Substation Failure
330kV transformer fails — 81,000 customers disconnected
🌵
Drought — 40% Hydro Cut
Kafue Gorge, Kariba and Victoria Falls generation reduced 40%
📈
Unplanned Demand Spike +25%
Industrial demand surge — peak load increases 25% across network
🔌
SAPP Interconnect Loss
Loss of 120MW SAPP import capacity
💧
Victoria Falls Full Outage
Both Victoria Falls units offline — 108MW lost
🆘
Dual Crisis: Drought + Demand
Combined drought generation reduction AND industrial demand spike
Manual Adjustments
Generation Adj. (MW)0 MW
-500+500 MW
Demand Adj. (MW)0 MW
-400+600 MW
Generation
2208 MW
Demand
1950 MW
Surplus / Deficit
+258 MW
Reserve Margin
13.2%
Frequency
50.026 Hz
Voltage Stability
98/100
Load Shedding Req.
0 MW
SAPP Export
38 MW
System Status: MEDIUM — Monitor
System Health Radar
GenerationStabilityReserveFrequencyDemand MgmtSAPP
Generation vs Demand (MW)
HydroThermalSolarSAPP035070010501400
  • Generation
  • Demand
Live Grid Schematic
Kafue Gorge990Kariba N. Bank720Victoria Falls108Bangweulu Solar60Maamba Thermal330Lusaka Sub.Kitwe Sub.Ndola Sub.Kabwe Sub.LivingstoneSAPP Interconnect120